Layed the canopy on the airframe to check the factory tape lines. They are more than adequate. Started assembling the canopy frame. Riveted the hinge to the side longeron. Made some tabs that the interior side panels will be attached to.


Click on a link to view the video:

2015-05-01-Cam.wmv