F01 Fuselage Complete.
Spar Tunnel.
Today I installed all rivets for the spar tunnel except for the 6 rivets that will be hard rivets needing to be bucked.
Landing Gear Bracket.
Today I placed the gear bracket into the fuselage. I installed all the rivets and bolts required per the plans.
Click on a link to view the video:
2014-02-06-CAM-1.wmv