F01 Fuselage Complete.
Spar Tunnel.
I drilled the holes and inserted grommets in the spar tunnel for the brake lines.
I also clecoed the aft spar tunnel and all the angles, gussets and brackets back into the fuselage. I did all the rivets in the fuselage side panels for these items.
Click on a link to view the video:
2014-02-04-CAM-1.wmv