I decided that it was time to finish some of the riveting.
F11-01 Fuselage Box Assembly.
I riveted the upper firewall F17-02 to the fuselage.
F06-01 Glare Shield Installation.
I riveted the glare shield to the longeron except where the panel cross tie is located. I will wait to rivet the panel and cross tie after the tank is installed and the panel layout is determined.
I also riveted the glare shield to upper firewall.
I also riveted the cross tie attach plates to the cross tie.