F11-01 Fuselage Box Assembly.
I installed the CCC-42 and CCC-44 rivets on the Forward Tunnel Zee.
I also clecoed the Aft Tunnel Assembly back in its location.
I also clecoed all the parts for the Side Panels.
Plans Page F11 is almost done.
The 3 remaining items that I will do later -
After I flip the fuselage I will install the MS24694-S54 Screws through the top longeron and splice plates,
Also after I flip the fuselage I will rivet the upper firewall in place, and
When I rivet the aft lower skin I will rivet the forward lower skin to the aft lower skin and the fuselage tail cone.