F16-02 Forward Tunnel Zee.
I did some more filing to get the shape and size correct. I drilled the 70 #40 pilot holes. I also drilled to 3 3/8ths holes.
I also rearranged the shop / work area. I positioned the Aft Fuselage upside down supported by the three work tables. This is the position I will use to start attaching the forward sides.
Click on a link to view the video:
2013-04-01-CAM-1.wmv