F21-01 Fuselage Tail Cone Box.
I removed the F24-01 Cross Tie Box and deburred all holes. I clecoed the Cross Tie Box back in place. I riveted the front to the Vertical Zees. Next I installed the AN3-7A bolts and washers at the top of the Cross Tie Box. I torqued the bolts to 25 in/lbs. I then riveted the the locations for the top of the Cross Tie Box.


Click on a link to view the video:

2013-01-25-CAM-1.wmv