F24-01 Cross Tie Box Assembly.
I finnished drilling all the #40 pilot holes on the upper web side of the assembly. I then removed the assembly from the jig, I used the forward channel and upper web to locate and drill holes in the table top portion of the jig, I clecoed the channels and upper web together into the table top and secured the ends of the channels to the jig. This way the assembly is up side down in the jig. I then located and clamped the lower web to the channels. I then drilled all the #40 pilot holes for the lower side of the assembly.


Click on a link to view the video:

2013-01-10-CAM-1.wmv