L01-04 Main Gear Legs.
I continued drilling the upper holes in the gear legs. I finished up drilling the first one to the 1/4 size using a new Cobalt drill bit.
I then drilled the pilot hole and final 1/4 size in the other leg.
I also bolted the engine mount back in position.
Click on a picture to enlarge it: