F09-01 Aft Lower Cabin Detail Installation.
I up drilled the holes for the Idler Assembly. I deburred all the holes on the Idler Assembly and the F10-07 Brackets. I riveted the F10-07 Brackets to the Idler Assembly. To do the riveting I had to loosen the bolts and slide the two halves a part. I then had to file the tails on the rivets until the was clearence between the rivet tails. I then tightened the bolts and torqued them. I repositioned the assembly to be sure it would fit properly and it did.
Next I started up drilling the holes to the #30 size.


Click on a picture to enlarge it:

gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail gallery thumbnail