F21-01 Fuselage Tail Cone Box.
F23-09 Forward Push Rod Support.
I installed the support by placing it per the plans. I drilled, up drilled and debured the holes. I did not rivet it in place. The Plans call waiting to rivet until after the push rod is installed.


Click on a picture to enlarge it:

gallery thumbnail