Builder's Log
DateAssemblyInstructionPartDescriptionLinks
02/04/2014 Fuselage F01 F01

F01 Fuselage Complete.
Spar Tunnel.
I drilled the holes and inserted grommets in the spar tunnel for the brake lines.
I also clecoed the aft spar tunnel and all the angles, gussets and brackets back into the fuselage. I did all the rivets in the fuselage side panels for these items.

Photos