P14 Battery Box.
I finished making the battery box. I located the box on the firewall. I drilled, up drilled and riveted the battery box to the firewall.

Engine Mount.
I replaced the temp castle nut with the final locking nuts that attach the engine mount to the fuselage.

Landing gear and hydraulic brakes.
I finished installing the hydraulic brake assembly to the axles. I ended up using a shorter clevis pin. I also used a regular AN960-1216 washer to get the right spacing between the wheel and the bake body. I drilled the hole in the axle for the cotter pins. I also torqued the bolt / nut holding the axle to the gear leg and inserted the cotter pin. I removed the saw horses under the fuselage. The plane is now sitting on its gear.


Click on a link to view the video:

2014-02-13-CAM-1.wmv