T01 Tail Installation.
Elevator Control Rod.
Finished fitting the elevator control push rod and elevator drive horn.

Vertical Stabilizer and Rudder.
Attached the Rudder to the Vertical Stabilizer with the hinge pin to locate the placement of the hinge to the Fuselage. Drilled and up drilled the holes for the half hinge that attaches to the fuselage. Deburred and riveted the half hinge. Found that the left rudder stop plate was not thick enough. Drilled out the rivets. Made a shim out of .06 sheet stock. Match drilled the holes. Riveted the rudder stop back in its location with the shim. Used counter sunk rivets for the last two rivets. Filed and polished the left rudder horn to fit properly on the left rudder stop.


Click on a link to view the video:

2014-01-25-CAM-1.wmv