F27-03R, F27-03L, F27-04R, F27-04L, F27-05R and F27-05L Right and Left Hand Vertical Channels #3, #4 and #5.
Today I used sharpies to draw the locations of the cut outs and holes.

F27-02R, F27-02L,F27-03R, F27-03L, F27-04R, F27-04L, F27-05R and F27-05L Right and Left Hand Vertical Channels #2 thru #5
Today I also used the drill press to drill all the #40 pilot holes. I also drilled the corners of the cut outs to a rough size radius. The larger holes were also started but will need to be updrilled to there final sizes.


Click on a link to view the video:

2012-11-16-CAM-1.wmv