W03-01R Right Hand Aileron - Drilled #40 pilot holes and updrilled #30 holes for all of hinge. Removed all clecos and deburred all holes. Re-assembled with clecos. Did all rivets per the plan except a couple that are close to counterbalance assembly. These will need a special tool to get done correctly. I need to investigate how I will do these last rivets.


Click on a link to view the video:

2011-11-04-CAM-1.wmv